Minimum clearance between the PV module(s) and the roofing material must be at least 10 cm. It is recommended that the module mounting structure be supported on top of a pole at least 50 cm long or fixed with supporting angles at four positions. The mounting structure must be anchored to the building or to the under. .
A metal pole must be fixed to the outer wall of a house by appropriate clamps and fixing material (screws and wall plugs in solid walls or screws in wooden beams) in. .
A metal pole at least 2“ (50 mm) in diameter must be used with the modules attached at the top of the pole. The pole must be anchored in concrete at least one meter. .
The structure shall incorporate galvanised steel or stainless steel hardware (bolts, nuts, washers, etc.) for all external connections. These include the modules-to. [pdf]